Project Portfolio

Our staff has extensive planning, project management, and engineering experience to successfully complete a broad range of complex projects in five primary lines of service: land development, water resources, municipal, environmental, and planning.  EC has performed projects for various municipal, state and federal agencies, regional water authorities, as well as a wide range of commercial, manufacturing, and industrial clients.  Management and engineering responsibilities include all phases of field investigation, feasibility studies, technology investigation, technology evaluation, process selection, conceptual and final detailed design, and construction management implementation.  EC is intimately familiar with applicable local, state and federal regulations.

Waller Creek Tunnel Project
The Waller Creek 100-year floodplain covers much of downtown Austin, spreading out up to 800 feet wide in areas and leaving homes, businesses, and downtown parks at risk for severe flooding and stream bank erosion.  More
Travis County Hamilton Pool Restoration Project
Hamilton Pool is a naturally occurring pool on Hamilton Creek. The natural feature has been a landmark for the Texas Hill Country and Austin area for centuries. In late 2007, the discharge of materials from an upstream residential development in Hays and Travis Counties into the Hamilton Creek watershed polluted and impacted the water quality of Hamilton and Davis Creeks and Hamilton Pool. More
TRA TRA Program Management
The Trinity River Authority of Texas (TRA) operates a number of regional water and wastewater systems throughout the Trinity River Basin. One of the largest of these systems is the Central Regional Wastewater System (CRWS), one that provides wastewater transportation and treatment for twenty cities and the DFW International Airport within the Dallas/Fort Worth metroplex. More
USACE USACE General Design Support Services and Multidisciplinary Planning Primarily Within the Limits of the New Orleans District
In September 2006, Espey Consultants, Inc.was selected as the most preferred firm for Solicitation No. W912P8-06-R-0198 by the US Army Corps of Engineers, New Orleans District. Since awarded the contract, Espey Consultants, Inc. has received several projects. More
City of Cibolo Master Plan
EC was selected in June 2004 by the City of Cibolo to prepare an update to the City's 1995 Plan. Within the nine years that have past since the original 1995 Plan was adopted, the City has more than tripled its population. More
Austin Clean Water Program
Section 2 of the Barton Creek Lift Station Relief Tunnel (BCLSRT), begins at the end of a shallow tunnel in Zilker Park and extends approximately 1700 linear feet at approximately 70 feet in depth. More
The Hollows Development
The Hollows is a 1,400-acre master planned community that surrounds Big Devil’s Hollow on the Northshore of Lake Travis.More
The City of San Marcos
The Texas Water Development Board (TWDB) provides assistance to local communities through the Flood Protection Planning Program, aimed at helping local communities study flood-troubled watersheds on a comprehensive basis. More
NTMWD Region C Planning Study Commission
It is recognized that one objective of the Region C Water Plan was to demonstrate viable water supply alternatives available to the Region C Regional Water Planning Area. More
  Galveston Bay Freshwater Inflow Study
In 1998, the Texas Parks and Wildlife Department (TPWD) recommended a pattern of monthly inflows as necessary for maintenance of the ecological health of the Galveston Bay estuary. More
Colorado River Flood Damage Evaluation Project
Espey Consultants, Inc. (EC) participated as a member of the Halff Associates consulting team involved in the award winning Colorado River Flood Damage Evaluation Project for the Lower Colorado River Authority (LCRA).
 